Lab Rules and Equipment Sharing

 

In Lab CS 364

Laptops:

Numbered 1 ­ 8

Partitions 1- 5

Login: root

Password: 1q2w3e for all partitions. Please change as soon as you have taken possession of your partition as per assignments below.

Each laptop has a wireless card and comes with two antennas, one large magnetic and one small pencil shaped.

Base Stations (Access Points):

2 installed -> one on Engineering Gateway and one on MPST Bldg (both on East Peltason). SSID: 243e, login: admin, password: 243e

3 available for checkout numbered 1 ­ 3. SSID: 243e, login: admin. password: 243e

IPAQs:

Numbered 1 ­ 8

Each iPAQ has a wireless card, a serial cable, a cradle, a stylus.

One power supply per two iPAQs

One Active Sync CD per 4 iPAQs

 

In LAB CS 171

Rack Mounted Equipment ­ 2 racks

4 Cisco 3600 routers

Login: root

Password: gradroot

4 Linux PCs

Partitions 1 - 2

Login: root

Password: 1q2w3e for all partitions. Please change as soon as you have taken possession of your partition as per assignments below.

4 Dell Workstations

Installed with NS and Opnet software for simulations

 

Ad hoc Routing Project:

Needs: 4 laptops, 4 small pencil shaped antennas

Group 1 -> Partition 1 on laptops 1 - 8

Group 2 -> Partition 2 on laptops 1 ­ 8

 

Vehicular Communications Project:

Needs: 4 laptops, 4 large magnetic antennas

Group 1 -> Partition 3 on laptops 1 ­ 8

Group 2 -> Partition 4 on laptops 1 ­ 8

 

 

iPAQ project:

Needs: 4 iPAQs each with cradle, stylus, serial cable and wireless card. 2 power supplies and 2 splitters for dual charging capability.

This project will get one bag/box full of equipment per group and will keep it till end of quarter.

 

Mobile IP Project:

Needs: 2 Cisco routers, 1-2 laptops, one Linux PC, 2 base stations

Group 1: Partition 5 on laptops 1, 2, 5, 6

Group 2: Partition 5 on laptops 3, 4, 7, 8